First pursuit workflow

Overview

This workflow takes your team from an empty pursuit workspace to a submission-ready package β€” requirements extracted, compliance answered, offers priced, authority forms filled, and final checkup passed. It assumes you already completed Getting started: team settings saved, optional inventory and alerts in place, and a pursuit created from a notice or standalone wizard.

Estimated time: 2–4 hours for a first pursuit on a typical supplies notice; complex works contracts with many lots can take days across multiple reviewers.

Tip: Before you start module work, confirm:

  • Team settings complete β€” company profile, legal representative, banking (Team settings)

  • Active team in sidebar matches the pursuit owner

  • Pursuit type and country correct on Pursuit overview

  • For notice-backed pursuits: latest notice version reviewed; tender documents downloaded

  • At least one team product in inventory (before technical offer)

  • Owner assigned on pursuit overview for kanban accountability

Important: A pursuit is independent after creation. Authority amendments update the public notice on sync β€” not your questionnaire or offers. When you see an obsolete-version banner on the linked notice, re-read Notice versions and update bid content manually.


End-to-end flow

Flow diagram

Submission to the authority still happens outside Tendersight on the buyer's portal. This workflow prepares your workspace; you upload or post the package externally, then move the kanban card to Bid submitted.


Phase checklist

Use this as your running scorecard. Check phases in order β€” later modules depend on earlier outputs.

☐ Phase 1 β€” Team settings verified (all three core sections)☐ Phase 2 β€” Inventory ready (recommended)☐ Phase 3 β€” Opportunity validated on notice overview☐ Phase 4 β€” Pursuit created; context confirmed☐ Phase 5 β€” Requirements extracted (in-depth analysis)☐ Phase 6 β€” Questionnaire answers and evidence☐ Phase 7 β€” Technical, financial, and works offers☐ Phase 8 β€” Documents, templates, required documents☐ Phase 9 β€” Final checkup passed☐ Phase 10 β€” Kanban updated (Bid submitted β†’ Won / Lost)

Phase 1 β€” Verify team settings

Even if you completed settings during getting started, re-open them before heavy document work. Empty fields you missed still propagate as placeholders.

Team β†’ Settings β€” confirm all three sections show saved data:

Section

Article

Minimum bar

Company profile

Company profile

Legal name, VAT, registry, headquarters

Legal representative

Legal representative

Name, ID document uploaded

Banking

Banking information

IBAN, bank name

Team β†’ Overview β†’ Configure team settings should show complete.

Optional same visit:

  • Company logo β€” headers on generated PDFs

  • Product quotation sources β€” live price feeds

Caution: Skipping this phase causes "complete" placeholders in generated PDFs and AI filler warnings. If you change settings mid-pursuit, regenerate every document you already exported.


Phase 2 β€” Prepare inventory

Team β†’ Inventory β†’ New product β€” choose manual entry, datasheet upload, CSV import, or connected service sync. At least one product unlocks technical offer automapping.

For larger bids, configure requirement categories and SME assignments before bulk questionnaire routing.


Phase 3 β€” Find and validate the opportunity

Discovery paths

Path

Steps

Notices browse

Opportunities β†’ Notices β†’ filter β†’ open title

Alert

Alerts β†’ Activity or email digest link

Analytics

Authority or company profile β†’ tender row

Assistant

"Search tenders in {country} for CPV {code} published in the last 14 days."

Validate on notice overview

Open Notice overview and confirm:

Check

Why it matters

Latest version

Amendments change requirements and documents

Submission deadline

Calendar and pursuit countdown

Estimated value

Bid/no-bid and pipeline reporting

Contracting authority

Research via Authority profile

Lots

Multi-lot scope β€” Notice lots

Documents

Downloadable PDFs for analysis

If a yellow obsolete version banner appears, click view latest version before creating or continuing pursuit work.

Tip: Run Notice products extraction on the notice when you want a preview of buyer product lines before opening the pursuit β€” credits may apply.

Entity context: Notice (Tender).


Phase 4 β€” Create the pursuit

Path A β€” From notice (preferred when synced)

  1. On notice overview, click Create pursuit (or Go to pursuit if your team already has one).

  2. Multi-team accounts: pick the owning team.

  3. Land on Pursuit overview β€” kanban card in Active.

β†’ Create pursuit from notice

Path B β€” Standalone

When the tender is not in the catalog:

  1. Team β†’ Pursuits β†’ New standalone pursuit

  2. Wizard: Details β†’ Documents β†’ Review

  3. Enter title, type, country, owner; upload authority PDFs if available.

β†’ Create standalone pursuit

Confirm pursuit context immediately

On Pursuit overview:

Field

Impact if wrong

Pursuit type

Works vs supplies vs services β€” which offer modules appear

Country

Standard forms, document volumes, sidebar modules

Owner

Kanban filters and accountability

Deadline / value

Dashboards and planning (editable from notice snapshot)

Incomplete context shows a navigation warning until type and country are set.

Entity reference: Pursuit.


Phase 5 β€” Extract requirements

Open In-depth analysis from the pursuit sidebar (under Reconnaissance for most country profiles).

Typical steps

  1. Select or upload authority tender documents (from notice download or standalone upload).

  2. Start the extraction task β€” processing runs asynchronously; credits may apply.

  3. When complete, review imported rows on In-depth analysis results.

  4. Import accepted requirements into Questionnaire.

β†’ Create analysis Β· Results

What you get

Output

Used in

Structured requirement lines

Questionnaire rows

Source references (document, page)

Evidence and audit trail

Optional product lines

Technical offer mapping hints

Caution: Re-run or supplement analysis when the authority publishes an amendment. Your pursuit does not auto-refresh β€” compare Notice versions and update manually.

Optional β€” Understanding module

Some country profiles include Understanding and Clarification requests before heavy questionnaire work β€” use them to summarize scope and track Q&A with the authority.

β†’ Understanding


Phase 6 β€” Answer the compliance matrix

Open Questionnaire from the pursuit sidebar.

Workflow inside the module

  1. Filter by category, status, or owner.

  2. Assign owners β€” manual or via SME assignments.

  3. Answer each requirement β€” text, yes/no, attachments as the row type requires.

  4. Attach evidence β€” datasheets, certificates, prior project proof.

  5. Track completion percentage on pursuit overview.

β†’ Questionnaire

Team coordination

Configure requirement categories and SME assignments for auto-reviewer routing; use Task management for cross-module deadlines.

Assistant: "Open the latest pursuit and summarize missing requirements." β€” sensitive writes pause for Confirmation required (Working with AI assistant).


Phase 7 β€” Build offers

Module set depends on pursuit type and country profile.

Technical offer (supplies and many services)

  1. Import team products or map manually to requirement lines.

  2. Complete attribute mappings β€” buyer spec ↔ your product attributes.

  3. Generate proposal text from mappings.

β†’ Technical offer Β· Attribute mappings

Run quotation generation only after inventory is populated.

Financial offer

  1. Build pricing tables and line items.

  2. Confirm totals, VAT treatment, and currency.

  3. Link rows to questionnaire requirements where required.

β†’ Financial offer

Works offer (construction pursuits)

When activated for works type and country:

  1. Open Works offer instead of or alongside standard technical paths.

  2. Complete construction-specific volumes and BOQ-style lines.

β†’ Works offer Β· Construction standard forms

Module order by pursuit type

Type

Typical module sequence

Supplies

Questionnaire β†’ Technical β†’ Financial β†’ Documents

Services

+ Understanding, task management

Works

+ Works offer, construction standard forms

Country profile may add or hide modules β€” trust the pursuit sidebar.


Phase 8 β€” Documents and submission pack

Documents library

  1. Open Documents β€” authority form volumes for your country and pursuit type.

  2. Run document AI filler β€” pulls team settings into PDF fields.

  3. Apply document templates for generated offer PDFs.

  4. Upload ad-hoc evidence into the library.

β†’ Documents library Β· Document editor / AI filler

Required documents checklist

Cross-check the pursuit Required documents view against authority instructions:

  • Every mandatory form present

  • Signatures and stamps where required

  • Expiry dates valid on certificates

  • File names match portal upload rules (if specified)

β†’ Required documents

Important: Regenerate any PDF after team settings changes. Stale exports keep old placeholders even when settings are now correct.

Team knowledge (optional)

Human resources, document templates, and content library feed personnel and boilerplate into documents when modules reference them.


Phase 9 β€” Final checkup

Run Final checkup before external submission. The module cross-validates questionnaire completion, offer consistency, and document presence against rules configured for your pursuit context.

Typical failures to fix:

Check

Common fix

Unanswered requirements

Return to questionnaire

Unmapped technical lines

Complete attribute mappings

Missing required document

Upload or generate in documents library

Placeholder fields in PDFs

Fix team settings β†’ regenerate

β†’ Final checkup

Assistant prompt: "In the active pursuit, list required documents not yet uploaded."


Phase 10 β€” Close out on kanban

After you submit on the authority portal (outside Tendersight):

  1. Open Team β†’ Pursuits.

  2. Drag the card to Bid submitted.

  3. When outcome is known, move to Won or Lost.

Column

Meaning

Active

Preparing the bid

Bid submitted

Package sent to authority

Won

Contract awarded to you

Lost

Not selected

Filters support deadline, value, owner, status, and source (notice-linked vs standalone).

β†’ Pursuits list / kanban

Team overview KPIs (pipeline value, win rate, submissions due) read from these same fields.

Sidebar sections vary by country and type β€” open modules from the pursuit left sidebar after selecting the card on Team β†’ Pursuits or via Go to pursuit on the notice.


FAQ

Can I start questionnaire before in-depth analysis finishes?

Yes for manual rows, but analysis is the fastest path for large tender PDFs. Wait for extraction to complete before bulk-assigning owners.

Do I need all three offers for every pursuit?

No. Works pursuits use Works offer; many supplies bids use technical + financial only. Follow your pursuit sidebar.

Can the assistant create my pursuit for me?

Yes, with Confirmation required β€” e.g. "Create a project from this tender." You approve before creation.

What if I hit the pursuit limit on my plan?

Creation fails with an upgrade message. Opening existing pursuits still works. Contact your team admin or see Billing.

Should I delete and recreate after a notice amendment?

Usually no. Update requirements and documents in place. Recreate only if you started from the wrong notice version and cleanup is faster than patching.

Where does submission happen?

On the contracting authority's portal or physical submission per the notice. Tendersight does not post bids on your behalf.

How do I hand off to a colleague mid-pursuit?

Invite via Team members, assign pursuit owner and questionnaire rows, share notice link for context.

What if I used obsolete tender documents for analysis?

Re-open the latest notice version, re-run in-depth analysis, and patch questionnaire rows before continuing offers.