Works offer (Bill of Quantities)

Overview

The works offer module stores the authority's Bill of Quantities (BOQ) β€” sections, chapters, line items, quantities, and measurement units. For works (construction) pursuits only. Many country profiles expose BOQ through the integrated Financial offer editor; a dedicated Works offer sidebar entry appears when your country profile includes it.

Structure without pricing is useless; pricing without correct structure breaks cascade totals. Complete structural edits before unit rate entry.

Tip: Before BOQ import, confirm you have:

  • Pursuit type = works and correct country on Overview

  • Authority BOQ PDF in Documents library

  • Run In-depth analysis with BOQ category when available

  • Validated section/chapter hierarchy against authority PDF

  • Team ready for long edit sessions β€” large BOQs have thousands of lines

Caution: Navigating away with dirty cells triggers unsaved warning β€” save batches regularly.


When this module applies

Pursuit type

Active?

Sidebar

Works

Yes

Via financial and/or Works offer

Supplies / Services

No

β€”


How to open

Path

Steps

Financial offer (works)

BOQ panel in integrated editor

Pursuit sidebar

Works offer when profile includes it

After analysis

BOQ extraction import prompt


Layout (dedicated BOQ page)

Flow diagram

BOQ items tab

Hierarchical table by section and chapter.

Column

Description

Item code

Authority reference

Name / description

Editable label

Norm code

Standard reference

Quantity

Measured qty

Unit

mΒ², mΒ³, buc, etc.

Unit price

Entered in financial offer

Total

Computed line

Summary tab

Counts: sections, chapters, items, priced vs unpriced.

Filters sidebar

Search by section, chapter, or text.


Key actions

Action

Result

Import BOQ

File upload or analysis extraction

Inline edit

Mark cell dirty

Save all

Batch persist dirty cells

Switch tab

Items ↔ summary

Discard

Warning if dirty

Dirty cell tracking

Element

Behavior

Per-field dirty flag

Local edits

Badge count

Unsaved changes

Save

Commits batch

live

Skips rows you are editing


Numbered workflow β€” BOQ from analysis to priced

  1. Run analysis on authority BOQ PDF.

  2. Import extracted structure to works offer.

  3. Spot-check 10 random lines against source PDF.

  4. Fix hierarchy misalignments.

  5. Save structural changes.

  6. Open Financial offer β€” enter unit rates.

  7. Summary tab β†’ unpriced count = 0.

  8. Construction standard forms financial volume.

  9. Final checkup.


Data flow

Flow diagram

Empty and processing states

State

UI

No BOQ

Empty import prompt

Loading

Placeholder rows while data loads

Import dialog

Upload UI

Saving

loading indicator on save

Empty filter

No matching rows


Downstream dependencies

BOQ data

Used by

Tree structure

Financial cascade

Quantities

Totals

Descriptions

Generated BOQ document

Priced totals

Standard forms, checkup


Edge cases

Situation

Action

Duplicate item codes

Merge per authority rules

Analysis missed chapter

Manual add rows

Unit mismatch

Fix before pricing

Teammate edit conflict

Save often


FAQ

Separate works offer vs financial only?

Country profile decides β€” both use same data layer.

Can I import Excel BOQ?

Use import dialog supported formats.

Edit unit price here?

Usually in financial offer editor β€” structure here, rates there.

BOQ changed in addendum?

Re-import delta; review priced lines.

Thousands of rows performance?

Use filters; save in batches.

Technical descriptions may reference BOQ items in narrative modules.


  • Financial offer

  • In-depth analysis β€” create

  • Construction standard forms

  • Final checkup

  • Pursuit overview

  • First pursuit workflow